Frameless Double-Shower Primary Bath
AI-generated design concept, not a completed project.
$13,200–$27,750 · planning range · 5–8 weeks




Purpose & footprint
- A serene warm-transitional primary bath centered on a large frameless-glass double shower with two rainfall heads and matte-black thermostatic controls, large-format warm-greige stone-look porcelain on the floor and shower walls with a continuous linear drain, a floating walnut double vanity with an integrated stone trough and matte-black wall-mounted faucets, backlit mirrors, a niche with honed marble, soft warm daylight from a frosted clerestory window.
- Concept dimensions only; exact room dimensions and clearances are not yet measured.
Scope & quantities
- Walk-in / curbless shower: 1 each
- Vanities: 2 each
- Toilet / bidet: 1 each
- Floor tile: 80 sq ft
- Wall / shower tile: 140 sq ft
- Frameless glass shower door: 1 each
- Heated floor: 60 sq ft
Materials & finishes
- warm greige stone
- walnut vanity
- soft matte black
- two matte-black wall-mounted vanity faucets
- twin rainfall shower heads with hand-showers
- backlit LED mirrors
Concept palette; specific products, availability and substitutions require confirmation.
Options
- Keep sound existing components where compatible.
- Compare stock, semi-custom and custom selections before ordering.
- Confirm samples in the room’s natural light.
Trades & site requirements
- Qualified plumbing and electrical trades as required; confirm existing shutoffs, ventilation and service capacity.
- Check access, working clearances, occupied-home protection, waste removal and delivery space.
- Check substrate condition, moisture and concealed services before installation.
Permits & engineering
- Verify local permit requirements and HOA restrictions before work; this concept does not establish an exemption.
- Confirm wet-area waterproofing, ventilation and electrical requirements with qualified trades.
Sequence & duration
- Measure and inspect → confirm scope and selections → check approvals → order materials → protect the site → install → inspect and finish.
- 5–8 weeks
- Installation window excludes design, approvals, fabrication lead times and unforeseen repairs.
Estimate basis & inclusions
- $13,200–$27,750
- Adjusted sample planning allowance. Feasibility at this budget has not been verified against current supplier and trade quotes.
- Covers only the stated quantities and installation scope; decorative objects and adjacent rooms are not included.
- Site condition, access, material choice, waste, permit requirements and concealed damage can change the written quote.
Exclusions & unknowns
- Exact product selection and current availability are unknown.
- Concealed damage, structural repair and utility relocation are excluded unless explicitly scoped.
- Permit and engineering fees, taxes and contingency require confirmation; they are not guaranteed included.
- Furniture, styling and loose appliances are excluded unless explicitly listed.
Care & maintenance
- Use manufacturer-approved cleaners; inspect grout, seals and exposed water connections regularly.
- Final maintenance instructions depend on the products selected.
Next steps
- Save the concept and note what you want to keep or change.
- Bring room dimensions and existing-condition photos to a walkthrough.
- Confirm a written scope, selections, permit needs and site-specific quote before work.
About this concept
- AI-generated design concept; not a photograph of a completed True Form job.
- Images illustrate a design direction; dimensions, code compliance and buildability require site verification.