Spa Primary Bath
AI-generated design concept, not a completed project.
$15,375–$31,500 · planning range · 5–8 weeks



Purpose & footprint
- A calm, spa-like primary bathroom: large-format warm limestone-look porcelain floor and shower tile, a frameless glass shower enclosure with a linear drain, a deep pine-green painted freestanding vanity with a honed quartz countertop and warm brass hardware, a soft white plaster wall behind a wide backlit mirror, warm brass sconces flanking the mirror, and a freestanding soaking tub beneath a window with soft daylight.
- Concept dimensions only; exact room dimensions and clearances are not yet measured.
Scope & quantities
- Walk-in / curbless shower: 1 each
- Freestanding soaking tub: 1 each
- Vanities: 2 each
- Toilet / bidet: 1 each
- Floor tile: 70 sq ft
- Wall / shower tile: 120 sq ft
- Frameless glass shower door: 1 each
- Heated floor: 70 sq ft
Materials & finishes
- warm limestone
- warm brass hardware
- soft white plaster
- deep pine vanity accent
- warm brass wall-mount tub filler
- warm brass rain-shower system
- warm brass cabinet pulls on the vanity
Concept palette; specific products, availability and substitutions require confirmation.
Design details
- Warm brass spa primary bath — roughly 120 sf
- A calm, spa-like primary bathroom finished in large-format warm limestone-look porcelain across the floor and shower. A frameless glass enclosure with a linear drain sits beside a freestanding soaking tub placed under a window in soft daylight. The deep pine-green freestanding vanity carries a honed quartz top with warm brass pulls, below a wide backlit mirror on a soft white plaster wall flanked by brass sconces. Warm brass repeats in the wall-mount tub filler and rain-shower system, so the room reads warm and quiet rather than glossy.
- Large-format limestone-look porcelain floor and shower tile
- Frameless glass shower enclosure with linear drain
- Deep pine-green freestanding vanity with honed quartz top
- Warm brass wall-mount tub filler and rain-shower system
- Wide backlit mirror on soft white plaster
- Warm brass sconces flanking the mirror
- Freestanding soaking tub beneath the window
Illustrative trade allowances
- Demolition & prep: $1,098–$2,012 — Fixture and tile tear-out, floor protection
- Shower waterproofing: $1,318–$2,515 — Full membrane system and linear drain at the shower
- Tile labor & material: $3,295–$5,973 — Large-format porcelain across floor and shower walls
- Vanity & top: $2,306–$4,401 — Pine-green freestanding vanity with honed quartz counter
- Plumbing fixtures: $2,306–$5,030 — Brass tub filler, rain system, and vanity fittings
- Freestanding tub: $1,208–$3,018 — Soaking tub supply and set beneath the window
- Shower glass: $769–$1,886 — Frameless enclosure, measured and set after tile
- Electrical & lighting: $988–$2,138 — Backlit mirror circuit, sconces, and exhaust check
- Plaster & paint: $879–$2,012 — Soft white plaster wall and bath-rated paint
- Project management: $879–$1,760 — Scheduling, supervision, and trade coordination
- Permits & inspections: $329–$755 — Plumbing and electrical permit scope
Illustrative allocation of the overall planning allowance across trades; these are not independently verified trade quotes. Site-specific costs may exceed these allowances.
Project assumptions
- Existing bath footprint and drain locations largely kept
- Tile priced as a porcelain allowance, not natural stone
- Tub and fixtures at a mid-premium allowance
- No window replacement or structural work included
Options
- Keep sound existing components where compatible.
- Compare stock, semi-custom and custom selections before ordering.
- Confirm samples in the room’s natural light.
Trades & site requirements
- Qualified plumbing and electrical trades as required; confirm existing shutoffs, ventilation and service capacity.
- Check access, working clearances, occupied-home protection, waste removal and delivery space.
- Check substrate condition, moisture and concealed services before installation.
Permits & engineering
- Verify local permit requirements and HOA restrictions before work; this concept does not establish an exemption.
- Confirm wet-area waterproofing, ventilation and electrical requirements with qualified trades.
Sequence & duration
- Measure and inspect → confirm scope and selections → check approvals → order materials → protect the site → install → inspect and finish.
- 5–8 weeks
- Installation window excludes design, approvals, fabrication lead times and unforeseen repairs.
Estimate basis & inclusions
- $15,375–$31,500
- Adjusted sample planning allowance. Feasibility at this budget has not been verified against current supplier and trade quotes.
- Covers only the stated quantities and installation scope; decorative objects and adjacent rooms are not included.
- Site condition, access, material choice, waste, permit requirements and concealed damage can change the written quote.
Exclusions & unknowns
- Exact product selection and current availability are unknown.
- Concealed damage, structural repair and utility relocation are excluded unless explicitly scoped.
- Permit and engineering fees, taxes and contingency require confirmation; they are not guaranteed included.
- Furniture, styling and loose appliances are excluded unless explicitly listed.
Care & maintenance
- Use manufacturer-approved cleaners; inspect grout, seals and exposed water connections regularly.
- Final maintenance instructions depend on the products selected.
Next steps
- Save the concept and note what you want to keep or change.
- Bring room dimensions and existing-condition photos to a walkthrough.
- Confirm a written scope, selections, permit needs and site-specific quote before work.
About this concept
- AI-generated design concept; not a photograph of a completed True Form job.
- Images illustrate a design direction; dimensions, code compliance and buildability require site verification.