- Can you open up the kitchen in my 1960s or 70s Garland ranch?
- Yes — it's the most common project we scope in Garland. Most ranch kitchen walls in Duck Creek, Club Hill, and Camelot are load-bearing, so the scope includes a structural evaluation, an engineered beam, and a city permit. A full kitchen reconfigure with the wall removal runs 7–9 weeks; a larger custom rebuild with layout changes runs 12–16 weeks. The beam and structural work are priced in the written scope before demo starts.
- My Garland house still has a 60-amp panel. Can you handle the upgrade?
- Yes. Pre-1980 Garland homes commonly have 60- or 100-amp panels — sometimes still fused — that can't support an induction range, a heat pump, or an EV charger. We fold a 200-amp panel upgrade into the kitchen or whole-home scope so the electrical work happens once, permitted and inspected, while walls are already open.
- What does a bathroom remodel cost in Garland?
- A guest bath refresh runs $10K–$18K. A primary bath reconfigure — new tile, vanity, and shower in a Club Hill or Oakridge home — runs $32K–$50K. A full spa primary with plumbing moves and a freestanding tub runs $50K–$75K+. In pre-1975 homes we price cast-iron drain replacement as a line item up front, because opening a 1960s slab without a plan for the stack is how other contractors' projects go sideways.
- Do you do aging-in-place remodels in Garland?
- Yes. Garland's single-story ranch stock is ideal for it: curbless showers, blocking for grab bars, 36-inch doorways, lever hardware, and better lighting — usually delivered inside a bath or whole-home remodel rather than as a bolt-on. The Good-Better-Best tiers spell out exactly which accessibility items sit in which tier.
- Can you work on homes in Travis College Hill or near the downtown square?
- Yes. Those blocks sit in Garland's historic districts, so exterior changes — windows, siding, porch work — need landmark review before permits issue. Interior remodels behind the facade generally don't. We confirm the review requirement with the city per scope, submit the application when it's needed, and don't start exterior work without the approval on file.